Are you looking for a pool? We provide excavations in Prague and surrounding areas, preparatory works. Excavations of the pool are carried out by a mini-digger. It is also possible to order a rubbish service. Excavation of the pool is done quickly and precisely so that the pool can be laid in the shortest possible time.
Price list of the pavement pavement
Making only work - Prizes for self-employment without delivery of materialwork | price per m 2 |
---|
Comparison of floors The price includes: preparation of the subsoil, compaction and straightening of the substrate. All without material | 150 CZK |
Installation of interlocking pavement Included in the price is handling shredder 4/8 and its comparison, laying, compaction and sandblasting. Everything is made of material. | 350 CZK |
Laying of road curbs The price includes the laying of curbs. All without material. | 150 CZK |
Laying Linea curbs, etc. The price includes the laying of curbs. All without material. | 110 CZK |
Laying of park curbs The price includes the laying of curbs. All without material. | 90 CZK |
Laying palisades with a height of 40cm The price includes palisades. All without material. | 200 CZK |
Laying palisades with a height of 60cm The price includes palisades. All without material. | 250 CZK |
Laying palisades with a height of 80cm The price includes palisades. All without material. | 300 CZK |
LVR - ancillary budget costsEarthworks - mini excavator, price according to actual hours. | 850 CZK |
Manual handouts, price according to actual hours. | 290 CZK |
Folding into a mosaic according to the difficulty | 850 CZK |
CAT track excavator 3,7 t *, price according to actual hours. | 600 CZK |
Container 3.5 m 3 (transport: 23 CZK / km), price according to actual hours. | 500 CZK |
Land transport container 3,5m 3 + transport | 1 200 CZK |
Dumping of container 3.5m 3 + transport | 1800 CZK |
* The track excavator is always transported by means of a containerComment:Items with only the estimate are billed based on the hours actually worked. A reduced VAT rate can be used in connection with § 48 VAT rates for residential construction.