The project of a family house must be completed before the application for a building permit for an important document - The project of placing a house on a plot of land , which always respects the relevant territorial decision for the given building plot and distance to adjacent land (buildings). Possible projects such as žump, WWTP, drainage, etc. are solved individually after discussion at the building office.
The project of installing the house on the site solves:- location of the house, both the position on the land and the height
- the principle of organization of construction on the given land
If any of the documents are missing, just say. We will provide or advise on how to get to the exact list of affected network administrators and other necessary background for the design of the house installation project.
The house installation project includes:- technical report, principles of organization of construction
- the situation of wider relations
- 1: 200 coordinate situation with plotting objects, network connections and access roads
Before building construction, you need several important documents at once.
Project documentation:
- plot of land - altitude and planting
- information on protection zones (including the conditions of their administrators)
- site plan of the given site - regulation
- site connection to engineering networks
- radon measurement result
- the idea of placing a house on the land
- location of houses on adjacent plots
- way of storm water disposal
- management of all utilities:
- water supply
- sewerage (sewerage, rainfall)
- electro
- O2
- gas
- electronic cables
If you do not have some backgrounds, or you do not know where and how to get them, we'll be happy to arrange or advise.The exact list of affected network administrators and a possible list of other necessary supporting documents for the design of the installation of the house on the site shall be specified by the relevant building office at the place of construction of the family house.
If you have found missing documents, we would be happy to advise you how to get them. In the note in the order form, please state that you are interested in submitting a separate offer to provide these documents.
Each of the 5 pairs of the House Settlement Project includes:
- technical report
- the principles of organization of construction
- the situation of wider relations
- coordinate situation at a scale of 1: 200 with object drawing, network connections and access roads
- drawing of a fire hazard area
Deadline for submitting the project:
The project of laying the house on the land is
min. 20 working days from the date of receipt of all necessary documents for project processing and payment of the deposit (unless stated otherwise).